Old 12-24-2016, 02:42 PM   #1
J
Senior Member
 
J's Avatar
 
Join Date: Jan 2004
Posts: 531
Default Major CSX Double Stack Clearance Milestone

The following video shows the first double stack train through the new Virginia Avenue Tunnel in Washington DC. This is the former CR, PC, PRR freight route between the NEC (and the old B&O routes) near Landover and the former Potomac Yard. The existing tunnel, about 100 years old, was double track until PRR electrified it in the 1930's. Even when CR removed the cantenary in the early 1980's the tunnel was too short to clear double stacks, mulitlevels, etc. CSX just finished a parallel cut and cover bore next to the existing one and opened it for service on Thursday. The old tunnel will now be removed and rebuilt to provide double track capacity. CSX now has a double stack route from the south east, through south Baltimore and west to their new center at North Baltimore Ohio and points west. The next major challenge will be the Howard Street Tunnel in Baltimore.

https://videocenter.csx.com/videos/v...34823683040947

This project was built underneath a residential street with all the modern environmental justice concerns that such activities now generate. For example, all tunnel wall support pilings were drilled even though a nearby large apartment building was able to use pile drivers. Google "Virginia Avenue Tunnel" to learn more about this interesting and cahllenging project.
J is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT. The time now is 09:40 PM.


Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.