The Chicago Clearing, ILL to Huron, SD manifest train swings onto the east end of the Drawbridge at Sabula. The train will cross from Illinois to Iowa as they cross the Mississippi River. CCHU will turn the corner at Sabula and begin the 98 mile trip up along the Mississippi River to Marquette, IA.