Grinding the rails between Hurricane, and Barboursville, WV before ceasing work in Barboursville and tying down for the day. The Loram Rail Grinder slowly moves through Culoden, WV under the US Route 60 Overpass on a chilly, 9 degree morning. This is a necessary treatment done to the rails between six and nine months. This extends the life of the rail by reducing surface defects to the head of the rail.