This train was only slightly over powered. PT98 works west along Snag pond in Gouldsboro with the Laurel Line Job tacked onto the rear. They would keep the two RS3's on the rear to simplify switching and would end up cutting them off at Mount Pocono before continuing to the Water Gap to meet the NS at the interchange.