As the background is shrouded with Appalachian coal dust, South Mississippi Electric Power Assoc. NS 730 (Williamson,WV-Purvis,MS) has got the track warrant rules the AGS North-End Dispatcher has giving the short loaded coal bucket the authority to proceed south from Wauhatchie to the North-end of the spring switch siding at Fort Payne, AL before meeting NS 164 which is coming north on the NS AGS North-End. Eventually the loaded coal train will arrive at the R.D. Morrow Sr. Fossil Plant to dump the mixture of bethgons, and Topgons loaded with Appalachian coal.