An overview of Lehigh Valley’s Bethlehem Engine Terminal reveals a variety of power in various states of readiness. As an SW1 leaves the turntable and heads out to work, two RS-11’s are on one of the turntable tracks, and the cab of an RS-3 can be seen in the servicing area. Farther out on the servicing tracks, a set of C420’s is being reconfigured, while a Reading/B&O power set is on the ready track. This power came in on train NE-84, and will take NE-87 to Potomac Yard after it arrives in the Lehigh Valley.