The second section of the Fallen Timber coal train heads west towards Cresson with 55 loads of coal bound for Strawberry Ridge (PPLX power plant).
This Juniata rebuilt GP leads the first section of Fallen Timber loads back towards Cresson at a little grade crossing at Dean, PA.