Eastbound Denton Dodger went on the law on the main at Cowley.
DART brought in a Silver Line train set for test runs between Plano and Richardson. Notice the company drone in the top right.
The local gets tied down with no rested crew to move the train.
The eastbound local returning to Wylie World gets tied down on the main waiting for a crew replacement at Cowley.
Eastbound 31 local merging on the new Silver Line trackage at Control Point Park.
Eastbound 31 local with a friendly wave from both engineer and conductor.
Testing the crossing on the DART Silver Line. CPKC resume traffic on the Alliance sub using this portion of the DART tracks until the Silver Line is ready for passenger trains in 2025.
The eastbound freight approaching GB tollway trestle.
Eastbound L31
L31 eastbound
L31 Alliance local eastbound
Empty ballast train
Assortment of power at Wylie Yard
CP 8143 working the Greenville Turn at Wylie.
CP 7022 with the Greenville Turn crossing the Levon bridge into the Wylie Yard. When I knew CP 7022 was about to bring in 169 on 07/30, I wished that the train would make it into to Wylie duri... (more)