The 2nd Bessmer train of the day rolls north passing the yard at Albion. The Bessmer only has 2 sets of power to move traffic, 3 tunnel motors and 3 SD 38's, and both were used today. At Conneaut ... (more)
3 tunnel motors work 74 loads of iron ore upgrade into Albion. The train is passing the west end of the yard at Albion and thru CE, which is the junction for the Erie Sub. This crew went on duty t... (more)
Southbound U702 is making their way back to Greenville, PA as they roll thru RX with 74 loads of iron ore. RX is where the CTC begins south of Conneaut, and runs all the way to North Bessmer, 124 ... (more)
The fantastic trio strikes again as 867S passes a sapling along Route 18 in downtown Albion at 4:48 PM. Recorded with a Nikon D5000 at 18mm, 1/400, f/6.3, ISO 100