Two six-motor GE's have 110 empty grain cars behind them as they are about to get on CSX trackage and run North on the Cumberland Valley to Corbin, Kentucky. These cars have just came out of stora... (more)
NS 386 looks through Harper tunnel as they are making their way down to the Big Stone Gap signal.
The sun has just popped back out as the storm clouds roll east on this "parked for the weekend" rail train at the Big Stone Gap siding.
NS 8829 and its crew gets blinded by the sun as they are coming through the Southern part of Big Stone on their journey to Norton.
The lead engines of a loaded train easily come to a stop while coming into Cadet for a banner test, about a quarter mile away.
CSXT 416 is pushing the T092-02 unit coal train around the curve and into Big Stone Gap out of Strawberry Patch.
An empty coal hopper train comes into The Strawberry Patch on a snowy February day.
Two BNSF punkins lead a scrubber stone train across the now 30 year old bridge connecting the CSX Cumberland Valley Sub up to the NS Appalachia District.
NS 745 Empty Duke Power train coming in to Big Stone Gap
CSX 442 with the empty Eastman Chemical coal train heading back to Harlan.
A loaded Progress Energy coal train passes under the Big Stone Gap signal.
NS 79K with a 70ACe leader comes around the curve from Furnace Dip at the foot of the hill from Lonesome Pine Hospital.
CSXT 128 (which is now blown up) leads an empty CSX coal train through Big Stone Gap toward Loyall, KY.
CSX 3073 is about to get a clear signal from the east end dispatcher at Knoxville with the passing of NS 745 at the CSX NS connection track in Big Stone Gap, VA. This photo depicts the start of bo... (more)
CSX 3073 heads up the hill out of Cadet Yard to the Norfolk Southern Connection to wait for a clear signal and a meet with NS 745.