CP 8508 throttles up after taking the connection from the NYC to the Wabash on its journey from Bensenville, IL to Detroit, MI.
A empty auto rack train has just come around the corner in Butler and starts to accelerate back up to track speed as it heads for Windsor On.
A pair of GEs lead a manifest past the elevator at Meadows.
Several minutes behind another eastbound, a lone GE leads stacks across the Crow River bridge.
CP #324-007-CP 8508, 8779, 2 h/e boxcars, 106 grain cars, CP 9649-450 axles @ 17:07 CP ~ CPWX, SKPX, CP, SOO, ALPX, EEC
GEs with containers around curve carrying hotrods, doritos and laptops from right side. Train 198 terminates at the packsack factory, where dirty feet are mandatory.
CN/CSX Detoured Train via the D&H
CP 8508 departs after a quick crew change.
CP 8508 takes off out of Swift Current with 106's freight.
CP 8508 leads 284 Eastbound toward the BRC and points East.