With 84 loads waiting at Taylor, a five unit lash up is ready for the task.
PO-75 power returns light to Mt Pocono from Cresco after setting off lumber loads at Bestway.
Starting up 3007.
DL-3 returns from Taylor.
The usual trio of six axles drags PO-74 this Sunday morning.
Delaware Lackawanna PO-74 works at Tobyhanna amid a fresh blanket of snow that arrived a week before Christmas 2022.
Three DL six-axles lead PO-74 past a snow and ice-covered Snag Pond in Gouldsboro on a chilly late fall morning.
A Pocono Ordinary rounds the curve east of the former DL&W signal bridge at Elmhurst, PA.
On the move to drill cars.
Waiting to begin the workday.
With a double ended (power) DL-3 this morning; PO-74 got underway later than usual. Passing through Gouldsboro en route to switch Toby.
Pushing sand cars into Taylor.
Delaware Lackawanna power idling at Scranton.
After dropping off sand cars in Taylor, DL trio will head to next assignment.