Although there is a coal bunker with loading facility at Dongbolizhan railway station, the steamlocomotives of the Sandaoling open cast mine railroad are usually supplied with coal at the bottom o... (more)
This morning, an astonishing large group of photographers and videographers from over the world watched the shift change "ceremony" at the Dongbolizhan station.
2-8-2 steamlocomotive JS (Jian She=construction) # 8167 is leaving the loading area in the open cast mine with 13 hoppers loaded with coal up for the washery.