The Engineer is backing into the spur track that serves Pulver Gas in Bridgehampton. Snow fighting equipment on the front of GP38-2 270 is used to dig out the switch that connects the North Freig... (more)
RS 60 is traveling on the then single track main line east of LIRR Brentwood Train Station.
They have one center beam for a customer east of Ronkonkoma. This area now is double track with the pe... (more)
The crew is returning from picking up empty stone cars from Apple Concrete in Yaphank. The train will come to a stop behind me and will switch Sherwood Lumber at the connection to the right.
NYAR GP38-2’s 270 & 271 are done switching Southern Container and are pulling the empties from the end of the spur. Roberts Plywood to the left is usually a night time switch by the RS 50. The ... (more)